![]() The design gradient was 1 in 80 and length of the preliminary alignment is approximately 42 km long and final detailed design length was 58 km long. Hydrology, drainage and geotechnical engineering data had been provided by the client, Myanma Railways. The preliminary alignment was designed from aerial photogrammetric maps and detailed design was done based on detailed topographic survey of actual terrain. The project's objective was to connect the missing link of Pakukku – Kyaw railway line and Myatmyaung – Gangaw railway line in northwestern Myanmar. V Kyaw-Myatmyaung Railway preliminary and detailed engineering design project Road alignment which complies with AASHTO standard and bill of quantities for construction work has been delivered. under the BOT agreement from the Ministry of Construction. The project includes Field Survey and Detailed Designing of Road Alignment for the 81 km of the National Highway system linked to Eastern Shan State of Mong Pan – Ta Sang – Mong Ton was developed by the Shwe Thanlwin Highway Co. ![]() V Nam San-Monei-Linkhay National Highway rehabilitation development project GPS Survey by Differential Global System V JICA Comprehensive GIS Database Project (2002-2004, 27000 sq-km) Establishment of Aerial Photography (1:50000) Myanmar Datum 2000 (Establishment of Aerial Photography (1 : 25000)
2 Comments
|
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |